ApplicationsApril 2, 20268 min read

Texas Data Center IMP Installation: Safer Panel Handling at Height

Data center construction across Texas demands high-volume IMP installation. Specialized panel handling equipment can help crews manage the scale and pace of these demanding projects.

By Highwall Lift Team
Boom lift with panel hanger during data center IMP installation in Texas

The Texas Data Center Construction Landscape

Texas has become a major hub for data center development. From the Dallas-Fort Worth metroplex to Austin, San Antonio, and beyond, hyperscale and enterprise data centers are under construction across the state.

These facilities share common characteristics: large footprints, aggressive construction schedules, and extensive use of Insulated Metal Panels (IMPs) for their thermal efficiency and rapid installation potential.

IMP Installation at Scale

Data center projects can involve thousands of IMP panels, each requiring precise positioning and secure fastening at height. The scale creates both opportunities and challenges for installation crews.

Volume and Pace

Data center timelines often drive aggressive installation schedules. Crews may be installing panels continuously across multiple shifts, making workflow efficiency a priority.

Height Requirements

Data center walls can extend 40 feet or higher, requiring boom lift access for upper panel courses. Working at these heights demands attention to both productivity and safety.

Panel Specifications

Data center IMPs often feature specific thermal ratings and finish requirements. Panels may be heavier than standard wall panels and require careful handling to avoid surface damage.

Panel Handling Approaches for Data Center Work

Crews installing IMPs at height typically use boom lifts for access. The question becomes how to manage panel handling from the lift platform.

Traditional Methods

Many crews position panels inside or against the boom lift basket, holding them manually while fastening. This approach is familiar but can become challenging at the pace and scale of data center work.

Dedicated Panel Support

External hanger systems, like the Highwall™ Boom Lift Hanger, are designed to support panels outside the basket during installation. This approach may offer advantages for high-volume work:

  • Panel support: The hanger holds the panel, potentially allowing crews to focus on positioning and fastening
  • Deck organization: With panels supported externally, platform space may remain available for tools and movement
  • Surface protection: UHMW pads are designed to help protect panel finishes during handling

Workflow Considerations for Texas Data Centers

Heat and Weather

Texas summers bring extreme heat that affects both crews and materials. Efficient workflows that minimize handling time may help crews work more effectively in challenging conditions.

Multi-Shift Operations

Data center projects often run multiple shifts. Equipment that supports consistent workflows across different crews may help maintain quality and pace.

Coordination with Other Trades

Data center construction involves extensive coordination. Panel installation crews working efficiently can help maintain overall project schedules.

Equipment Specifications

The Highwall™ Boom Lift Hanger is designed for IMP and large-format panel installation:

  • Capacity: Supports single panels up to 106 lbs
  • Panel protection: UHMW pads help protect panel surfaces
  • Construction: Galvanized steel for durability
  • Wind rating: Designed for winds under 10 mph
  • Price: $397/set

For more details on how the Highwall system supports [IMP installation workflows](/blog/highwall-lift-installing-imps-data-centers), see our detailed application guide.

Planning Your Data Center Project

If you're bidding or planning IMP installation for a Texas data center project, consider:

1.Panel specifications: What are the weights and dimensions of the specified panels?
2.Height requirements: What boom lift reach will the project require?
3.Volume estimates: How many panels will be installed, and over what timeline?
4.Crew planning: How many crews and shifts will the project require?
5.Equipment needs: What panel handling approach fits your operation?

Learn More

For Texas data center projects requiring IMP installation at height, the Highwall™ Boom Lift Hanger may support more organized panel handling workflows.

[View our products](/#products) or [request a quote](/#quote) to discuss your specific project requirements.

Discuss Your Data Center Project

Contact us to learn how Highwall™ Lift-Hangers may support your Texas data center IMP installation requirements.